Quantcast
Channel: Dashew Logs – SetSail FPB
Viewing all articles
Browse latest Browse all 358

Dashew Offshore: A Bit Of History Part 2 – The Big Roach Cruising Main

$
0
0

Deerfoot 2116

You are looking at a huge mistake: a new mainsail that did not fit, with too much roach.

John Conser and I had miscommunicated. The new, super high tech and high cost main for Deerfoot II did not fit. The roach was way too big and stuck out almost three feet behind the backstay. There was no re-cut that would save the sail. It, he, and we were toast.

But let’s at least give it a try before trashing it, we thought. We sailed faster of course, closer to the wind, and surprisingly, with less heel. As nice as all this was, dropping the main halyard each tack or jibe so that the roach would clear the backstay was not practical.

So we decided to try a tack with the sail hoisted. And it cleared. We tried it again…same result! We quickly realized we had a breakthrough of sorts for fixed backstay cruising yachts.

Deerfoot 2 106
Compare the roachy main above with the conventional main below.

Deerfoot 2 105

The new main had way more area up high where the breeze is stronger. The more elliptical distribution of sail area increased effective aspect ratio reducing induced drag–hence less heel.

Sundeer new roach mains

We ordered new big roach sails for Sundeer with the same result.

Beowulf-Sper-Roach105-Edit

On our  later designs like the Sundeer 64 ,60, 56, and Beowulf above, we went to swept spreaders and eliminated the backstays, allowing more roach, creating even more efficient sail plans. These resulted in powerful rigs, with a low center of effort, and very efficient drag angles. This allowed a small crew to harness the power, and the sail plan could be carried longer before reefing was required. Shallower draft was also a byproduct.

Beowulf Sper Roach101

Our performance really took off with this second generation main and mizzen, which Dan Neri and Kenny Read designed and built for us at North. These came after the Volvo ocean race in 2001 where the mainsail girth restrictions had been eased. The high end competition taught North how to build big roach mains that were flat at the top and twisted off nicely with wind shear. With these mains, and the two code zeroes, the two of us averaged 300+NM, anchor to anchor, on tradewind passages.

And all because of the mistake with the new main for Deerfoot II.


Viewing all articles
Browse latest Browse all 358

Trending Articles