FPB Construction Update As Of December 18,2013

$
0
0

FPB 78 1 contruction 12 19 13 100

The parts pile grows larger for the first FPB 78.

FPB 78 1 contruction 12 19 13 101

Shortly after the Kiwis return from their holiday break we’ll start to see these sub assemblies being fitted onto the building jig.

FPB 97 1 contruction 12 19 13 100

Meanwhile, FPB 97-1 is coming together and is now at a point where it is possible to get a feel for her shape and volume.

FPB 97 1 contruction 12 19 13 101

Of course we are prejudiced, but we do think this a lovely looking shear.

FPB 97 1 contruction 12 19 13 106

The stairs leading to the Matrix deck.

FPB 97 1 contruction 12 19 13 107

The Matrix deck from the aft starboard corner.

FPB 97 1 contruction 12 19 13 103

Looking into the great room from the main entrance door.

FPB 97 1 contruction 12 19 13 104

The framing for the great room settee.

FPB 97 1 contruction 12 19 13 102

Finally, the swim step and lockers.